Lewes Ferry Terminal Generator Replacement

Arora was responsible for electrical engineering services for the replacement of two existing emergency generators at the Delaware River & Bay Authority Lewes Ferry Terminal.

The Lewes Ferry Terminal consists of several ferry docks, vehicle ramps, DRBA offices, and a terminal building. The goal was to consolidate electrical services, distribution, and emergency power generation to eliminate old malfunctioning equipment and simplify maintenance as well as to bring the electrical installation into compliance with current codes. The project also included the conversion of the emergency power fuel source from diesel to natural gas.

 