LGA Rehab of Taxiways West of Runway 4-22
Arora prepared contract documents for the rehabilitation of Taxiways West of Runway 4-22 at LaGuardia Airport. The existing asphalt concrete taxiways required mill and overlay to maintain a “state of good repair” and extend the useful life of the pavement.
The primary scope of work entailed the removal and installation of taxiway drainage and electrical infrastructures, the milling and overlay of asphalt pavements, full-depth installation of asphalt pavements and the revision of pavement markings and signage.
Arora was responsible for electrical tasks including LED airfield lighting fixtures and signage, underground distribution, manhole/handhole modifications and electrical distribution to facilitate pavement construction. Arora also provided construction administration services.