Ronald Reagan National Airport Terminal B/C Redevelopment

The Metropolitan Washington Airports Authority (MWAA) procured professional engineering services for on-call planning, design and construction projects at Ronald Reagan Washington National Airport (DCA). This is a multi-year, multi-task A/E task order program for Terminal B/C at DCA. The program objective was to centralize TSA operations for passengers and secure and expand the existing Terminal B/C to ensure equitable and efficient passenger level of service. The long-term redevelopment will complement the on-going near-term rehabilitation efforts and lead to a full facility program.

The New North Concourse (NNC) project consisted of an addition to Terminal B/C to facilitate expanded airline operations with 14 new gates, several concessions spaces and airport operations. The new concourse will offer passengers greater connectivity, more shopping and dining options, and a more gratifying post-security space.  The project adds approximately 200,000 SF to DCA. Arora provided full Electrical, Plumbing and Fire/Life Safety.

SCOPE OF SERVICES INCLUDED:

Arora Engineers, Inc. (Arora) was part of the joint venture team identified as AIR Alliance, comprised of AECOM and PGAL. Arora’s overall scope of services for AIR Alliance included full Electrical, Plumbing, Fire Alarm and Fire Protection engineering services. Arora was also responsible for conceptual design services integrating renovated space in the Secure National Hall and the New North Concourse connector with the existing systems and technology at DCA. Additionally, Arora provided Construction Administration services for the New North Concourse.

Photo provided by MWAA

Owner

Metropolitan Washington Airport Authority

Location

Washington, DC